Product Updates
Keep up to date with Fraction ERP development! All updates are automatically rolled out.
07/2024
SFDC Improvements
Shop floor data capture will track time already spent and display remaining time and update the progress bar to suit the remaining time. Manual SFDC logs can be added using the reporting tool. Non-productive SFDC has been created to allow time for non production work to be logged.
07/2024
Resource Monitor Status
Shop floor data capture now shows the status of resources (workcentres) or (operators) to enable visual management of production.
05/2024
Fixed Demand Parts
Parts can be defined as a fixed demand, meaning if the part is added to a Bill of Materials, it will not be multiplied by the demand quantity for the works order. This is ideal for inspection, subcontracting, or processing which is not dependant on quantity.
03/2024
BOM Import Tool
You can now import parts for your Bill of Materials (BOM). All parts should already exist in your parts database and once you create the BOM, you can now import using our template.
03/2024
Global Purchase Order Date
All purchase order line items can be set to the same due date. Click the date required and 'apply' to set the due date on all line items.
03/2024
Improved User Management
User management module for administrators allows you to switch users between "normal" and "SFDC" account types. Users can also be set as inactive then they leave the company.
03/2024
Break times can now be added to workcentres.
Each workcenter can now have multiple break times added to accurately calculate the daily and weekly capacity.
02/2024
Images used on contracts
If a part record has an image, users can enable printing with images and the quotations and order acknowledgements are printed with images displayed. We also added the image to the Bill of Material page.
01/2024
Import function for tooling register
The tooling register now has an import function to allow users to import of data from spreadsheets. The tooling register features cavitation which is specific for the plastic injection moulding industry.
01/2024
New KPI for Quality Costs
View your quality costs over any date range and filter by customer - our new KPI for quality costs can be found on the KPI page.
12/2023
Works Order Box Labels
When packaging large volume parts from production runs into boxes, this new box labelling features allows each box to be identified by the quantity of parts within the box. The system will automatically calculate the labels needed base on the parts per box, defined in the Bill of Materials.
12/2023
Packaging Items
Parts can be marked as "packaging" which allows users to define how many parts will be packaged into each container. After entering the quantity the price for the BOM will be divided by the "parts per box".
11/2023
Data Import Tools
Data import tools are now added to the parts, customer and supplier listings. This enables users to upload their own data from Excel spreadsheets.
11/2023
Key Performance Indicators
A new page called Key Performance Indicators is now released. This moves the OTD from the dashboard to the KPI page and makes space for task management. The KPI page is now also updated with invoices sales and order intake metrics.
10/2023
ERP Task Management
New feature released! Tasks management tool for all users of Fraction ERP to manage anything - choose your own categories such as maintenance, purchasing, 5S, quality audits and customer follow ups. We will be integrating this feature with the data in Fraction to make it even more powerful.
08/2023
Certificate of Conformance
All shipments records can now be used to create a certificate of conformance. This feature includes a scanned signature to add to the certificate along with your own customised declaration.
06/2023
New tooling database to specify jigs, tools and fixtures required for any BOM
Any jigs or tooling used during production can be stored in the tooling database. This list is then available to add the tooling or jigs required to each BOM and the tooling list is shown on the route card. This can even be applied for cutting tools. This is available on pro and moulding versions.
06/2023
Scrap items are logged when completing a WO.
If some parts are scrapped during production, this can be logged when completing a WO - meaning all parts are consumed, but only the completed quantity is entered into stock
06/2023
Production yield used to determine WO quantities for production
Any part can now contain a scrap rate. This is used to determine how many parts should be requested on the works order in order to meet the required quantity and allow for the scrap rate. This is available on pro and moulding versions.
06/2023
Use percentage to specify the part ratios used in BOMs for plastics and chemicals
Parts on a BOM can be defined as a percentage of the BOM part. The part record contains the part mass, which is used when calculating the requirements for the WO part demand (MRP). This is available on pro and moulding versions.
06/2023
Raise purchase orders directly from the sales order line item
If you are buying in parts for your sales contracts you can now raise a PO directly from the sales order line.
06/2023
Sales order production status
Each contract now has a production status to visually indicate when all line items are waiting, in production or ready to ship.
05/2023
Parts records now contain a photo upload
Every part in Fraction ERP can now have a photograph stored. This is also printed onto the route card to help operators identify the correct parts.
04/2023
Add files to NCR records
Upload files to your NCR records such as photos, drawings and reports.
03/2023
Production Scheduling Tool Update
The scheduling tool now highlights the time frame for the work order being scheduled, based on its start and end dates.
02/2023
Exclude Parts from On Time Delivery
Any part can now be flagged to be excluded from on time delivery performance. Ideal for service charges such as shipping which does not reflect production performance.
01/2023
Production Scheduling Gantt Chart
Production scheduling gantt chart now added to the production module. View all operations in an easy to use gantt chart for both weekly and daily scheduling.
11/2022
SFDC Logs Editing
Shop Floor Data Capture (SFDC) logs can now be corrected when staff forget to stop a log. Only users given "SFDC Editor" will be able to see the edit button to update the start or end time of an SFDC log. Permission is given to any normal user from the user profile page.
11/2022
Part Allocation Improvements
Part allocations have been improved and you can now see all allocations under each part record. For each allocated quantity the sales order or works order reference is shown and once they are completed, the allocations are removed.
10/2022
Shop Floor Data Capture Report
Shop floor data capture (SFDC) logs can now be viewed from the reports section. The logs can be filtered by date, workcenter or operator and also exported to Excel.
09/2022
Reports section added!
A new reports section is now available under the business menu. The first report is sales by customer, which can be filtered by date and exported to Excel.
08/2022
New ready status filter on operations list
The operations page now has a filter for ready operations. These operations are ready for the next operation and can be filtered by workcenter or assigned employee.
07/2022
Send Part Files on Email from Contracts and Purchase orders
When sending an email from the Fraction ERP system you can now include files that have been saved to the contract or purchase order and files that are saved to any line items.
07/2022
Refresh Bill of Materials Costs
A new button on the BOM will refresh the latest part prices and operation costs to make sure the BOM pricing is up to date.
07/2022
Enquiry Feature
New contracts can now be saved as enquiry. Once a quotation has been printed or emailed, it will automatically be updated to a quotation. Enquiries on the dashboard will show you open equiries that are still to be quoted to your clients.
06/2022
Markup Costing Structure for Subcontractors
The Bill of Materials, now has a new costing structure - using markup on material costs to be added to labour costs. Great for subscontract machining and fabrication
04/2022
On Time Delivery Performance
Dashboard now shows your on time delivery performance for the current month and year to date. It is caculated from contract shipping date and shipment date when items are dispatched. Click the tiles on the dashboard to search, filter and see your delivery performance. Data can be exported to Excel.
04/2022
Sage Cloud Accounting Integration
Fraction ERP now integrates with Sage Cloud Accounting software.
03/2022
File Storage for Contracts, Works Orders and Purchase Orders
Files can now be uploaded to contracts, works orders, and purchase orders in addition to parts and bills of materials. This allows safe and easy access to customer purchase order, material certification, inspection reports, photos and drawings. Integrating this feature means you don not have to connect to the company network to get access to file storage.
03/2022
SKU Part Numbers
When creating new parts, you can now assign a unique SKU (stock keeping unit). This can be prefixed in options with your own prefix to identify it.
02/2022
Multiple Suppliers and Supplier Part Numbers
Any part can now have multiple suppliers linked to it in order of preference. You can also store the supplier part numbers and when you order from that supplier, they will only see their own part numbers
01/2022
Sales Order Demand Page: Consolidating demand
A new page called sales order demand groups all sales order lines by part number, allowing them to be selected and then consolidated into one works order. The works order will show which contracts requires the parts.
01/2022
Stock Allocation on Sales Order Line Items
If you carry stock of a part, you can allocate this part to a contract line item. A new workflow for raising works orders considers the allocated stock so your production quantity is made to suit.
01/2022
Works Orders now Have Start Dates
If a part has a production lead time, the start date is automatically set. It can be manually set with or without lead times. This defines the required by date for all parts on the WO which is used in part demand to schedule purchasing.
12/2021
Manually Link Works Order Demand with Purchase Orders
When you create a manual PO, you can link this back to works order demand and vice versa, improving traceability
12/2021
Time Zone Support
We can now support international clients by enabling time zones to be configured in your user profile
11/2021
GRN Labels
GRN records now have labels which can be printed to identity materials at the goods receiving process.
11/2021
Invoice Update
Fraction Invoices now contain the delivery note reference and the tracking reference on the PDF invoice.
11/2021
Auto-Complete of Contracts
Contract line items now have a status of Invoiced and when all line items are invocied the contract will be automatically set to complete.
10/2021
Pack Size for Purchasing
Parts can now have a pack size defined and the purchase order will ensure the pack size and minimum order quantity are satisfied. For example, if you want to ensure 5 packs of 10 are always ordered, the pack size is 10 and the minimum order quantity will be 50.
10/2021
New Quality Section on Dashboard
A new quality section to the dashboard shows open Non-Conformance Reports to action.
10/2021
Works Order List, Status Flag
If a part has a production lead time, the start date is automatically set. It can be manually set with or without lead times. This defines the required by date for all parts on the WO which is used in part demand to schedule purchasing.
10/2021
Part Demand Allocation Flag
The part demand page, now changes the status to green to visually make it easier to track any items that have not yet been fully allocated for production.
10/2021
Email Logs
When sending documents such as quotations, purchases orders, and invoices via the built in direct email feature, a log is now created on the page for the date, time and user that send the email and the recipient.
10/2021
Email Shipping Notifications
From the shipment page you can now send your customers a shipping notification email with the order and shipping details.
10/2021
Shipments now have multiple packages
Shipment records now store multiple shipping items to track size, weight and quantity of packages on the shipment
10/2021
Refresh Part Descriptions on BOMs and Contracts
From the BOM parts list or on a contract line item, you can now refresh the part description to revert to the master part record description
10/2021
Modify Works Orders with Parts and Operations
A works order can now be edited to add or remove parts and operations. This feature is ideal for service work and jobbing shops where the exact process and materials may not be known at the start
09/2021
Stock Quantity now shown on Contracts
Contract line items now display the current stock level for the part
09/2021
Multiple Delivery Addresses for Contracts
When editing a line item in a purchase order, you can use the current price to update the part record price, just tick the box to perform the update.
09/2021
Add Parts on the Fly from Purchase Orders
From a purchase order record you can now create new parts on the fly
09/2021
Batch and Serialised Number Traceability
This feature is now available for advanced users and allows all incoming parts to be given a batch or serial number which flows through fraction ERP until you sell goods using your own or the Fraction ERP batch and serial numbers for finished goods.
09/2021
Part Allocation of Stock
Part allocations can now be performed in part demand page.
09/2021
Part Demand, Child Work Orders
On the part demand page, any part that is a child works order will now be shown with a link to view the works order record.
09/2021
Hold Search
If you use the search bar and then leave the page or open a record, the same search will be held you come back to the page.
09/2021
Re-sequence Line Items in Contracts
To re-sequence line item in a contract, just drag and drop them into position and the line item numbers will update.
09/2021
Show Line Items on GRN Page
On the GRN list you can now use the show line items button to expand the list into line item details and search by part number or description.
09/2021
Goods Received Inwards Inspection Workflow Added
Any part can now be flagged for inwards inspection. On arrival the GRN is processed as normal. A part with inspection requirements will not be added to stock until the inspection process confirms the accepted quantity of the GRN. A new tile on the dashboard will alert users to any line items that have pending inwards inspection to complete.
09/2021
Non Stock Parts
Any part can now be flagged as a non-stock item so no stock transactions will take place. This is perfect for service items, engineering work or subcontract processing.
09/2021
Purchase Order Approval Workflow and Limits
Purchase Orders now need to be approved before they can be printed. The user must be ticked as a PO Manager on their user profile and each user can have their own spend limit per single PO.
09/2021
Minimum Order Quantity on Purchase orders
If you set a minimum order quantity for any part and raise an PO, the system will check the minimum quantity is met. For example, if you are buying screws in boxes of 100 and try to purchase 50, it will ask you to update the quantity. At the moment you can still order say 101 screws, so this is not the same as pack size multiples which be implemented shortly.
08/2021
Workcentre and Employee Capacity Planning
Workcentre and employee capacity used to be defined by a number of hours per week. As we develop the system for daily and hourly planning we have changed how capacity is defined. Each resource now has a daily schedule with a start and end time. We now use this to calculate the daily and weekly capacity.
08/2021
Part Activity Page with Purchase Orders
The part activity page is now updated with all purchase orders for the part with price and quantity
07/2021
Purchase Order Approvals
All purchase orders now require approval before they can be printed or emailed. Approval is a single click by users who have the role of PO MANAGER ticked on their user profile.
06/2021
Delivery Note Statement
The delivery note now has a new option to add a statement such as ownership clauses or statements of conformity. You can add a title to the section and 5 lines of text from the options page under the settings menu.
06/2021
Date Filters and Total Values
You can now apply a date filter to sales orders, works orders, purchase orders, invoices, and shipments. On pages with values, we also added the total of the records on the page, or applied on the filter.
06/2021
Excel Reports Added to Parts Module
On the parts page you can now download your parts inventory to excel.
05/2021
Contract Date
Contracts now feature a contract date. This date starts when you create a contract record. If you convert a quote to a sales order at a later date, the contract date is updated to current date to reflect when you received the order. You can also manually adjust the contract date if needed. The username has been added for traceability
05/2021
Excel Reports
Excel reports can be exported from the invoice and purchase order modules
05/2021
Direct PDF Printing
These documents are now downloaded as a PDF, quotations, order acknowledgement, invoice, purchase orders and delivery notes.
04/2021
Available Stock on Part Demand
On the part demand page you can now see available and allocated stock.
03/2021
Copy Bill of Materials
On the Bill of Materials (BOM) page, just click "copy" to create an identical BOM. Make sure the part number has already been set up to copy the BOM.
03/2021
Invoice Directly From Sales orders
From a sales order you can create an invoice without a shipment. Invoices can also be printed as a proforma invoice.
02/2021
Add Drawings to Part Records
Within the part record you can now upload drawings and files.
01/2021
Fraction ERP System is Launched!
The start of our product launch was functional and basic. At the time we thought it was pretty good, but we now love to look back and see how far we have come and think about how far we can take it!